2015
Da Nang, Vietnam

The terminal is designed to have two separate levels for arrival and departure with total floor space of 48,000 square meters. The capacity is expected to serve 6 million passengers a year.

Project Requirements

Concrete: 7-day strength concrete for all structures: bored piles, pile caps, foundations, columns, beams, slabs, overfly bridge, pavement.

Flooring: Abrasion resistance for baggage sorting areas and dust-proof coats for plant rooms.

Waterproofing: For bridge deck; flexible membrane with highly crack-bridging property for overfly bridge driveway.
For tanks and wet area: Cementitious materials for potable water, fire-fighting; Water tanks; Waterproofing the slope of the bridge.

Roofing: For planter box; high flexibility membrane below protective screed motar

Refurbishment: Tile Adhesive; Tile adhesive for natural stone (granite, bazan) on floors, for ceramic tiles on toilet, wet areas. Expansion joint of overfly bridge

Main Product Families Used

Sikaplast®-152
Sikaplast®-257
Sikafloor®-161 HC
Sikafloor®-81 Epocem
Sikafloor®-263 HC SL
Quazt sand

Sika® tilebond
Sikalastic®
Sikatop®
Sika® waterbar
Sikagrout®

Project Participants

Designer (Architect):
CPG Singapore

Consultant (Engineer):
CONINCO

Main Contractor:
HARN CORP, HOA BINH, BRIDGE 17

Applicator:
BACH KHOA, CB, VINASTONE

Concrete Supplier:
DANG HAI, PHUOC YEN, HOA CAM

Construction Period:
November 2015 – May 2017